Antennas, tanks, sheds, solar and other equipment. 10 rules found.

Rules for everyone

In force Applies to: All lots

Solar devices on roof or in fenced yard (not taller than fence); ACC approval needed; roof units no higher than roofline, parallel, silver/bronze/black frames, on ACC-designated roof area unless >10% more output (NREL)

Note: Decl. Art 5(k): solar collectors need ACC approval, screened

Source: Adoption of rules under Chapter 202 of the Texas Property Code · Page p6-7 (D) · Recording Doc 2011-11029542 · Effective 2011-12-20

In force Applies to: All lots

Owner installs and maintains electric service at own cost per NEC; all electric lines, cables and conduit underground from lot boundary to structure regardless of meter location; all utility lines underground (8(c),(d))

Note: No rule on meter location, disconnects or exterior panels beyond this

Source: First Amendment to Amended and Restated Declaration of Covenants and Restrictions for Elliott Ranch · Page p2 · Recording Vol 1654 Pg 864 · Effective 2000-03-31

In force Applies to: All lots

"Improvement" includes exterior air conditioning, water softener equipment, pumps, tanks, pipes, lines, meters and electric/gas facilities, so all need ACC approval before install

Note: No HVAC placement or screening standard found

Source: Amended and Restated Declaration of Covenants and Restrictions for Elliott Ranch · Page p4 (Art 1) · Recording Vol 1512 Pg 913 · Effective 1999-02-26

In force Applies to: Not stated

—

Note: No rule found in the ingested documents

Source: No source listed · Page — · Recording — · Effective —

Rules for specific phases

Not sure which phase you are in? Find my phase.

See something wrong or out of date? Report a problem with this page.

Home Back to top